USAID reporting, from the data rather than from memory.

Karagem ships the PPR layout as a report template. The indicator table is built from your live data, and every indicator more than ten per cent off its target arrives with a deviation narrative already drafted from what the numbers show.

In the productBuilt in. USAID is one of four donor templates in the product today.Updated 2026-10-14

What the PPR actually asks for

An indicator table with baseline, target, actual and per cent achieved, disaggregated where the indicator requires it — and, for anything off by more than ten per cent, a written explanation of why.

The table is the easy half. The deviation narratives are what turn a reporting week into a reporting fortnight, because each one needs somebody to remember what happened in a quarter that ended six weeks ago.

The deviation narrative, drafted rather than blank

Karagem knows the shape of the miss — how far off, in which direction, against how much of the programme calendar — so it drafts the sentence that states it, and you write the part only a person knows: the cause, and what changes.

"Delays in procurement" is a category, not a cause. "Seed arrived six weeks after the planting window, so adoption for the long rains is lost; revised expectation 2,100 by December" is a cause, a consequence and a number, and it is the difference between a reviewer accepting the explanation and asking three more questions.

And the data quality assessment behind it

USAID assesses data quality on five dimensions — validity, reliability, precision, integrity, timeliness — and the assessment is about provenance, which cannot be added afterwards.

Because every reported figure traces to an approved submission, a person, a place and a form version, the DQA becomes an export rather than a fortnight of reconstruction.

A worked PPR row

Take an indicator: "Number of farmers adopting improved seed", baseline 0, annual target 3,000. The field team’s submissions put the actual at 2,050 by the end of Q3 — 68 per cent achieved with 75 per cent of the year gone, which is a 21 per cent shortfall against target and over the ten per cent line.

The PPR row Karagem produces reads: baseline 0, target 3,000, actual 2,050, 68.3%, disaggregated 1,180 women / 870 men across three counties — and a drafted deviation opening: "Achievement is 21% below target with one quarter remaining." You replace the draft’s second sentence with the cause and the correction; the arithmetic, the disaggregation and the trace to approved submissions are already done.

Try it on a sample programme. Inside the real product, in under a minute.

Sign in with your Eagmark account and Karagem sets up a sample organisation for you — a Kenyan smallholder programme, as an example: sixty farmers, seven indicators, surveys with responses, tasks and alerts. Explore, then start your own in any country and any sector.